Guiding plan for expansion

Line title
Proyectos_plan_rector

SHORT-TERM CORRIDORS (2011-2015)

  • Avenida 80 corridor
  • Line C commercial operation
  • Multipurpose railway system corridor, phase I
  • New station between Industriales and Poblado

MEDIUM-TERM CORRIDORS (2016-2020)

  • Avenida Oriental to Avenida 80 with Calle 80 corridor
  • Project of Line A expansion to the north (Navarra)
  • Avenida 34 corridor between Aguacatala station and Palos Verdes
  • San Antonio de Prado – La Estrella corridor
  • North-west cable corridor
  • Quebrada La García corridor
  • New station between Envigado and Itagüí (Primavera)
  • New station between Madera and Acevedo

LONG-TERM CORRIDORS (2021-2030)

  • Multipurpose railway system corridor, phases I, II and III
  • El Salado – Ayurá corridor
  • Alpujarra – El Vergel corridor
  • El Poblado – Terminal del Sur – Avenida 80 corridor
  • Itagüí Metrocable (Envigado – Calatrava)
  • Connection to Eastern Antioquia
  • Sabaneta corridor
  • Transportation system in Eastern Antioquia
  • Santa Mónica corridor
  • New station between Poblado and Aguacatala