Close
Logo
Estado de las líneas Conoce nuestras líneas y sus estados
loading
banner-innv

Corporate open innovation program

Results of challenges published from November 2022 to June 2023

Program objective

Promote citizen participation through the contribution of innovative ideas to technical and social challenges that impact our Company and its stakeholders:

Contributions received

Challenge: How to reduce congestion to enter the Metro System?

Challenge: How could we improve mobility at our San Antonio B station?

  • Reserved wagons
  • Transmitting
  • Solidarity fare moves me
  • Metro on timeMED
  • Travel planner
  • Contingency trains
  • Promote user circulation in the metro system
  • Cívica quota
  • Metro transportation flow
  • Extension of Metro schedules
  • Better use of wagons
  • Strengthening regulations
  • Strengthening measures san Antonio
  • Transformation
  • Removal of boarding platforms
  • Integration Line A and Line B
  • Corporate pico y placa restriction
  • Implementation of mobility strategies
  • Restricted access
  • Commuter train
  • Differential fare
  • More routes, less congestion

Challenge: How could we improve mobility at our San Antonio B station?

  • Improved mobility in line B
  • SmartMetro
  • Back to the top
  • Sensorics and artificial intelligence (AI) as tools to optimize the system:
  • "Optimization of transport operation in Metro systems by two-color station categorization."
  • GENERAL COLOR CLASSIFICATION
  • Short trains from Madera station
  • Add vehicle
  • Classification, order, color
  • Train on standby at the track switchers
  • Categorize by color
  • Categorize trains or use of software
  • Connection Line, Line C
  • Technology for the user's benefit
  • Various
  • Existing resource
  • Access regulation
  • ONE MORE TRAVEL
  • Organization prior to entry
  • Duplication of metro stations
  • Continuous metal platforms and internally interconnected trains
  • Alternate route
  • Access and evaluation
  • Division by wagons
  • Alternate routes
  • Change in train departures
  • New Line A
  • Mobility of san antonio station
  • Improve line B
  • Reversing the platforms
  • Mobility control
  • Light wagon
  • Metro points
  • Continuous Train
  • Structural, internal and social strategies.
  • Solution San Antonio station decongestion
  • Direct ticket
  • DOES NOT EXIST IN FOLDER, CHECK WITH LPARRA
  • Expansion of passenger capacity

Results

Once the ranking process was carried out, it was found that the proposals received required greater depth in order to comply with the TRL3 or SRL3 levels required as a determining factor in order to move up to the evaluation process; therefore, it is necessary to declare the selection of one initiative deserted.

We thank you all for your interest and participation. Metro de Medellin would like to invite you to learn more about our open innovation process and we hope to count again with your participation in the next challenges.

nube-izquierda
nube-derecha
icon-grafica-1